[img]http://picasaweb.google.com/rv33we/Pane ... 4990625506
I finally have something to post that isn't like everyone before me. Simple panel with GRT Sport & EMS, VP-50, TruTrak ADI Pilot I, LRI, and Garmin stack.
Now the hard part; the electrical connections. I had Stein supply a couple harnesses but the system is still in the design phase. Vertical Power has been good to work with, but I never wanted to be an electrical system designer, yet that is my status.
The engine is mounted, James Holy Cowl and plenum are mostly finished. I still have the hinge between top and bottom to rivet on, but the alignment is not perfect yet.
I started construction Dec 1, 08 and have 800 hours into the QB. My goal is airborne this summer.
C A
7A tipup
[/img]
________
ONE TREE HILL FORUM
Panel Status
Panel Status
Last edited by calake on Sat Feb 19, 2011 6:19 pm, edited 1 time in total.
-
- Chief Rivet Banger
- Posts: 4013
- Joined: Thu Oct 14, 2004 8:40 pm
- Location: Baltimore, MD
- Contact:
Sweetness dude 
I am looking forward to seeing pictures of it powered up!
Spike

I am looking forward to seeing pictures of it powered up!
Spike
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl
Current Build: 2 years into a beautiful little girl