Man I've got a lot done lately! Both of my tanks are at the same point-all of the ribs are sealed and riveted. Now I'm just working on fitting the fuel pick-up tubes and the floats, and I'll be ready to close these bad boys up.
They sure look good with no clecoes.
Fuel Tank Progess!
Fuel Tank Progess!
RV-7 Working on Wings
Build Log: http://www.aircraftstickers.com/RV7A/RV7A.htm
RV Stickers: http://www.aircraftstickers.com
Build Log: http://www.aircraftstickers.com/RV7A/RV7A.htm
RV Stickers: http://www.aircraftstickers.com
- Joe Parish
- Class D
- Posts: 311
- Joined: Wed Apr 21, 2010 3:42 pm
- Location: Sioux Falls SD
-
- Class C
- Posts: 625
- Joined: Sat Nov 13, 2004 8:37 pm
- Location: Sartell MN