Thanks guys...
Let me apologize for the poor wording of my question as I was rushing to post my request for help and in the process I botched on the clarity.
In the instructions, I was instructed to set aside a "Seventh Attach Bracket" (for each wing) that was only drilled on one side using an 1/8 in drill bit. The instructions referred later to this "Seventh Bracket" in the instructions that I have quoted below.
Cleco the drilled T-712 Attach Angles to the aft side of the pre-punched main wing spar so you have good access with a drill. Position them so the center line is centered in the pre-punched holes in the spar. Clamp the angles in place and drill the remaining holes using the spar as a guide.
Remove the angles and rivet the plate nuts to them, then bolt them in place on the front of the main wing spar.
Cleco the T-702 Baffle to the forward side of the T-712 Attach angles. Check to see that the centerlines on the angles are visible through the holes in the baffle.
Cleco the seventh attach angle to the tank baffle between the baffle and the spar. Verify that you can see the centerline on the angle through the holes in the baffle and the spar.
(Instructions continue)
I am good with most of this but I am unclear as to where this "seventh bracket" should be positioned on the spar. I understand it belongs "between the baffle and the spar" but at which particular bracket "Station" (my word).
Sorry for being so wordy, but I also want this to be clear in case there is someone else in the future that might struggle with this and might find my question helpful.
Sorry guys,
I don't try to be obtuse.
I am just missing something here.
Thanks for your generous help and Patience.
CD