My tail kit is "At Destination Sort Facility".
It's saying it'll be delivered the 21st 7pm, but if it's already at the 'destination sort facility', maybe it'll come tomorrow!
bouncy bouncy bouncy bouncy
bouncy bouncy bouncy bouncy
Ian
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
That's what happened with my tail kit...arrived one day early!
http://www.chadandbrittne.com/june_2005_empennage.htm



http://www.chadandbrittne.com/june_2005_empennage.htm

oddly enough, it came TWO days early. They tried to deliver it yesterday, although the online tracking didn't ever say it was out for delivery. They took it back because it's signature required.
It was marked as out for delivery this morning, and as I was leaving, I found the door tag they left yesterday. I called and found out that they'll be trying to deliver again between 3 and 5pm, so I guess I'm leaving work early! It'd be tight trying to get it in my car, so I really don't want to have to pick it up.
It was marked as out for delivery this morning, and as I was leaving, I found the door tag they left yesterday. I called and found out that they'll be trying to deliver again between 3 and 5pm, so I guess I'm leaving work early! It'd be tight trying to get it in my car, so I really don't want to have to pick it up.
Ian
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
They tried to deliver it at 2:30. I got there at 2:50.
Ended up having to go pick it up. It BARELY fit in my car!
Already have gotten cranking on the HS! Spar doublers are shaped and prepped, and clecoed into the spar channels. Tomorrow night, drilling!
Ended up having to go pick it up. It BARELY fit in my car!
Already have gotten cranking on the HS! Spar doublers are shaped and prepped, and clecoed into the spar channels. Tomorrow night, drilling!

Ian
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
RV-7 SB, chugging toward final assembly
IO-360-C1C 200hp obtained.
Hartzell BA prop received.
James Cowl ordered.
N773WW reserved!
- captain_john
- Sparky
- Posts: 5880
- Joined: Sun Oct 31, 2004 9:17 am
- Location: KPYM
Congrats on getting started Ian. One hint I can give for the HS is read the notes on the drawing, not just the instruction sheets, there is at least one operation not in the instructions that is a whole lot easier to do before those two bars are rivetted in place. The little cut-outs in the bottom flange of each spar is what I mean.

Another hint, mark a line on the forward spar flange pieces before you drill them using the skin as a template, and make sure that line shows through the holes in the skin.
Last hint, read ahead and test measure a LOT before doing the holes and cutting of those 404/405 pieces where they join the forward spar and stiffeners.

Another hint, mark a line on the forward spar flange pieces before you drill them using the skin as a template, and make sure that line shows through the holes in the skin.
Last hint, read ahead and test measure a LOT before doing the holes and cutting of those 404/405 pieces where they join the forward spar and stiffeners.
Don Sinclair
CYKF
RV-7A (Fuselage)
CYKF
RV-7A (Fuselage)