Build update: Im pooped...

A forum for the proverbial airport bum who just wants to talk about anything and everything related to flying. Introduce yourself here !!

Post Reply
Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Build update: Im pooped...

Post by Spike »

I did a proseal session yesterday. From start of setup to end of cleanup was 6 hours. I was able to get to 5 internal ribs riveted into my left tank. I didnt get to bed until long after my bedtime. It was cool to look at the tank this morning before work. Proseal isn't so bad, it just takes forever to do stuff when working with it. I figure 2 more sessions and Ill be done the tank. Can't wait.
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

User avatar
cjensen
Whiskey Victor
Posts: 5275
Joined: Sat Apr 23, 2005 10:36 pm
Location: Green Bay, WI

Post by cjensen »

First one? Seems like I remember you already had sealant on the carpet from a previous session... :P

I know what you mean by being pooped...I worked 8.5 hours yesterday! :o
Chad Jensen
Missing my RV-7...
Vertical Power support
920.216.3699
http://verticalpower.com

User avatar
smittysrv
Class D
Posts: 287
Joined: Sat Sep 03, 2005 7:10 am
Contact:

Post by smittysrv »

Wow! You must be be pooped! My time slot for working each day (before momma gets home) is a little less than 2 hours. Putting in only 1 rib a day wore me out.

Take the rest of today off! Tell the boss, Smitty said...

Have a goodun!

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

cjensen wrote:First one? Seems like I remember you already had sealant on the carpet from a previous session... :P

Ahhhh, the infamous carpet caper. That was for gluing the foam wedge into trim tab. Close enough though. Im much less messy now too.
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

User avatar
Brantel
Class B
Posts: 1030
Joined: Wed Aug 30, 2006 3:23 pm
Location: Newport, TN

Post by Brantel »

Yep,

The tanks take some time. Wear you out!

I am on my second. Spent most of the day Saturday sealing end rib parts, filler hole, drain hole and stiffners. By then I had all I could take of it.

The baffle to me is the hardest part because there is so much work involved all at once. Make sure you have plenty of time to work on it before you start.
Brantel (Brian Chesteen),
RV12-IS, #121606, N912BC - Building Now!
RV10, #41942, N????? - Project Sold
RV-7/TU, #72823, N159SB - SOLD

User avatar
Womack2005
Class D
Posts: 486
Joined: Mon Oct 17, 2005 1:20 pm
Location: Appleton, WI

Post by Womack2005 »

I have to say that I am not enjoying this whole tank buisness as much as I have the rest of the build so far. The prep and cleanup take up a lot of time.
Will
7A 72452 Wings
\_____@(")@_____/

User avatar
smittysrv
Class D
Posts: 287
Joined: Sat Sep 03, 2005 7:10 am
Contact:

Post by smittysrv »

Make sure you have plenty of time to work on it before you start.
When I got to the back baffles, I took the day off from work and made sure that no one else was home, so I wouldn't be interrupted. The only problem I ran into was not anticipating how much proseal I would need to go around the edges. I had to make a mad dash to the cans to mix more proseal to get the last 6 inches around the flange.

User avatar
RV9inIowa
Class E
Posts: 138
Joined: Tue Oct 17, 2006 11:38 pm
Location: Cedar Rapids IA

more proseal!!

Post by RV9inIowa »

smittysrv wrote:The only problem I ran into was not anticipating how much proseal I would need
I'm doing both tanks at once and the same thing happened to me. I did the "mad smitty dash", and finished the right baffle this Saturday. It took 6 hours for the whole baffle, including cleanup. It was easy work, except for the solid rivets on the end ribs are a pain. The pop rivets are easy with the air powered pop rivet tool. The skin rivets are really easy, but there are a lot of them.

BUT - I don't have enough proseal for the other baffle so I'm waiting till this weekend when the box from Vans shows up. I'm a card carying member of the "use a lot of proseal" club!

Before baffles I thought proseal wasn't so bad, now I just want it done. If all goes well, by Sunday my tanks will be completely finished. I'm going to wait a few days and then leak test them. This is how I'll feel if there are any leaks :cry:
Dave G.
Building N149DG RV-9A Finish Kit, O-320-E2A, Dual AFS-3500
Flying the restored N3689Q, the lowest time airworthy Beech Super III.

User avatar
painless
Class C
Posts: 703
Joined: Sun Mar 06, 2005 12:42 pm
Location: Peshtigo, Wisconsin

Post by painless »

The key to prosealing your tanks is to not get in a rush. Don't expect to make huge progress with each session.

Patience grasshoppas......Patience.....

8)
Jeff Orear
RV6A N782P
Hatz Classic, Welding fuselage
Hatz build log. https://eaabuilderslog.org/?blproject&p ... GNCwv&sid=
Peshtigo, WI

User avatar
JohnR
Class B
Posts: 1081
Joined: Mon Aug 29, 2005 3:22 pm
Location: Iowa

Post by JohnR »

Wow guys, 6 hours, that is quite a proseal marathon! Glad they are coming along.

Dave, I think I have about a 1/2 can of proseal left. You could have borrowed it so you could have kept going. Maybe you could have gone 10 hours. :evil:

I was fortunate enough ot get both tanks done before Luke headed off to college. Two people really helps on the baffle especially. Luke is supposed to get home this weekend for the summer so maybe I'll start making some progress again. Seems everyone is really hitting it hard here lately!
JohnR
RV-7A - Fuselage - SOLD, just not supposed to be
Numbers 6:24 - The LORD bless thee, and keep thee

User avatar
aparchment
Class C
Posts: 522
Joined: Tue Nov 15, 2005 9:43 pm

hittin' it

Post by aparchment »

Yup, hitting it hard alright. I got the top skins riveted on my left wing on Sunday. I got my buddy up the street to help me with a 4 hour riveting session. He's a good sport. He's also a great riveter since he's a musician and keeps great time on the rivet beats.

Now for the right wing!

I just want these damn things done. I have been looking at them for a year now!

User avatar
RV9inIowa
Class E
Posts: 138
Joined: Tue Oct 17, 2006 11:38 pm
Location: Cedar Rapids IA

Post by RV9inIowa »

JohnR wrote:Dave, I think I have about a 1/2 can of proseal left. You could have borrowed it so you could have kept going.
Thanks John - I bet I'll only use a "little" from my 3rd can :o Actually I think I've wasted a lot along the way... all part of the joy that is proseal.

I was gonna ask to see if you had any but I thought I'd just bite the bullet and get it done the right way. You've already helped me so much, I'm gonna get a complex. Besides, dealing with Vans for parts orders is so fun!
Dave G.
Building N149DG RV-9A Finish Kit, O-320-E2A, Dual AFS-3500
Flying the restored N3689Q, the lowest time airworthy Beech Super III.

User avatar
cnpeters
Class E
Posts: 185
Joined: Tue Jul 04, 2006 7:04 pm
Location: Eureka (St. Louis), MO
Contact:

Post by cnpeters »

For the second tank currently being worked, the Rick Galati method was so superior to the first tank effort ( http://rickgalati.com/subpage9.html ). It involved fay sealing the parts to be joined, then clecoing them and leaving to dry. Come back after a day or two for a no-slop session of riveting. Barely a mess, more efficient. Took only two hours to do all 7 RV-9 tank ribs with a single 6oz. cartridge and the Van's proseal 'caulk' gun, and then cleco them. Riveting took 3 hours - I also used the technique to ream each skin hole with 2 or so twists of the Avery countersink tool ( http://www.mykitlog.com/users/display_l ... 3721&row=2 ). All the rivets heads set flush compared to being slightly proud on the first tank. I also did not use sealant on them - the ribs were carefully sealed as is, and shop heads will be covered soon in my next session. Just some ideas... .
Carl Peters
RV-9A
N92RV (reserved)
Fuselage
http://www.mykitlog.com/cnpeters/

User avatar
cjensen
Whiskey Victor
Posts: 5275
Joined: Sat Apr 23, 2005 10:36 pm
Location: Green Bay, WI

Post by cjensen »

I was over at Carl's house last night, and his tanks look awesome!! I have zero doubts that he'll have any problems. They sealed very well using the fay sealing method. :good job:
Chad Jensen
Missing my RV-7...
Vertical Power support
920.216.3699
http://verticalpower.com

Post Reply