
(sorry for the sideways pic, but I'm too lazy to host it other than where it already is

Step one was to cut a hole in the bottom of my leading edge for the "optional" inspection hole. I guess you can do the install without the hole, but I think it would require tools that I don't have...... lol

After deburring the cutout and drilling the holes for the backing plate and dimpling them, I mounted the brackets that hold the inside end of the tank in place:

A reinforcement plate with a couple of nutplates gets riveted to the inside rib for the Facet pump to mount to:


Tube from the pump to the fitting that the transfer hose connects to to send the fuel to the main tanks:

The outboard end of the tanks bolt to the end ribs and a vent line is plumbed to a predetermined spot on the bottom skin:

Piano hinges for the wingtips:

Power wire for the Facet pump:

There's an unused hole already in the spar, so a rubber grommet is all it takes to run the wire to the standard conduit.
I had to get a little creative for the fuel door in the wingtip, since I may have shortened the wingtip more then HW planned when I was mounting it:




And.......DONE!
