One wing at a time, or both simultaneously ?

A forum in which to discuss topics that are not specific to a particular series of aircraft (ie. how to cut alclad)
Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

One wing at a time, or both simultaneously ?

Post by Spike »

Getting ready to dive into the wings (yeah I know, about time) and am debating with myself if I should do one at a time or both simulataneously. Shop space is somewhat at a premium. The question is how much, if any, time is saved by doing both at the same time?

I know lots of you guys are doing both at the same time. Anyone doing one at a time?

-- John
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

tshort
Class C
Posts: 618
Joined: Tue Nov 30, 2004 12:56 am
Location: Indianapolis, IN (KUMP)

Post by tshort »

Here's my .02...
I think it would be harder to do all the steps on one and then realize you have to do all the same stuff again ... it makes it seem faster to have everything going at once. On the other hand, it might be a good motivator to get one done... I think if you build the jig right it shouldn't be too much more space - maybe 2.5-3' of width?
DC did his one at a time and seemed fine with it...

Thomas

User avatar
rv8or
Class E
Posts: 148
Joined: Fri Oct 22, 2004 1:50 pm
Location: DFW

Post by rv8or »

My $.02...

A lot of the wing work is a beat down...boring & repetitive. You will most likely want to do as much of the tedious stuff as you can to get it done, and not have to look at doing it all over again, like Tom said.

Since you're in that place anyway, the only difference between one at a time and two, is the space/jig. You have to store either the second wing's parts, or the 1st wing you complete. I was going to hijack the second bay of the garage either way.

All this led me to do them both "simultaneously". All that really means is they are jigged at the same time. In my case, I tend to complete something on one wing, then do the same item on the other...mainly so my little brain doesn't mix up the parts or lose track of what I'm doing! :mrgreen:

Joe
Last edited by rv8or on Thu Aug 31, 2006 3:11 pm, edited 2 times in total.
Joe Ferraro
aka: "jferraro16"
DFW, RV-8A Fuse

User avatar
RV7Factory
Beanpolt
Posts: 522
Joined: Fri May 20, 2005 2:28 pm
Location: Livermore, CA

Post by RV7Factory »

Once one is done, where are you going to store it while the other is in the jig? My point is, building one at a time might not save you as much space as you think. Just food for thought.

Edit: Ooops, looks like Joe already mentioned this. :oops:
Last edited by RV7Factory on Thu Aug 31, 2006 6:10 pm, edited 1 time in total.
Brad Oliver
RV-7 | Livermore, CA
RV7Factory.com
Image

User avatar
RV7Factory
Beanpolt
Posts: 522
Joined: Fri May 20, 2005 2:28 pm
Location: Livermore, CA

Post by RV7Factory »

One more thought...

It seems to me that being able to learn something from one and immediately apply it to the other (wing) is valuable. I finished my first tank a week ago, and my second tank is going soooo much quicker because of the experienced gained from the first. If it were months later, I doubt that experience would be fresh enough to be as valuable.
Brad Oliver
RV-7 | Livermore, CA
RV7Factory.com
Image

User avatar
cjensen
Whiskey Victor
Posts: 5275
Joined: Sat Apr 23, 2005 10:36 pm
Location: Green Bay, WI

Post by cjensen »

Well, you know how I did mine. As Joe said, there are parts of the wings (ribs, fuel tanks, skins...well pretty much all of it) that are repetitive, and quite frankly the prep stuff sucks. I'm really glad I did them together to get ALL the wing rib deburring and fuel tank sealant stuff done at the same time. I'd hate to be looking forward to another set of ribs or sealant sessions... :bang:
Chad Jensen
Missing my RV-7...
Vertical Power support
920.216.3699
http://verticalpower.com

User avatar
captain_john
Sparky
Posts: 5880
Joined: Sun Oct 31, 2004 9:17 am
Location: KPYM

Post by captain_john »

I am glad I did both at the same time. With my ADHD, I could never have done the right one without the left one staring me in the face!

Wicked Stick is much smarter than me. He did each one individually.

I needed the left one in order to figure out the right one!

:oops: CJ
RV-7
Garmin G3X with VP-X & a TMX-IO-360 with G3i
It's all over but the flying! 800+ hours in only 3 years!

User avatar
Thermos
Class D
Posts: 328
Joined: Sat Nov 06, 2004 7:26 pm
Location: KASH
Contact:

Post by Thermos »

RV7Factory wrote:It seems to me that being able to learn something from one and immediately apply it to the other (wing) is valuable.
I'll second that opinion. Plus, with my glacial building pace, if I did my wings one at a time I'd forget everything l learned on the first wing panel! :o

Dave
Dave Setser
Avionics, Firewall Forward
http://www.mightyrv.com
Putting the "slow" in slow-build since 2004

User avatar
Wicked Stick
Class B
Posts: 1000
Joined: Wed Feb 09, 2005 10:00 pm
Location: KEWB

Post by Wicked Stick »

I did my wings one at a time. I suppose I could have made enough space to do them both at once, but I figured by the time I got one done, the 2nd one would go much faster, and it did.

If your tight on space, doing one at a time is better than having to squeeze between the two stations and bump or dent something.

One at a time is a little less boring since your cutting the process into two seperate sessions for debur, flute, and priming all those ribs.
Dave "WS" Rogers
RV-8 (125 hrs & counting)
N173DR

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

I did lost of measurements last night and I am going to have to do one at a time. My space is only 10 feet wide and I dont see being able to do both at the same time and easily operate around each one. That will also give me an intermediate goal that I can reach easier. Im goal oriented so that should make it a bit easier on me.
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

User avatar
Womack2005
Class D
Posts: 486
Joined: Mon Oct 17, 2005 1:20 pm
Location: Appleton, WI

Post by Womack2005 »

I've been working on mine for about a week now and I am nowhere near putting them in the jigs. (in fact I haven't fabbed them yet) My point is that a lot of work can be done outside the jigs. I've seen where builders even put on the ribs with the spar on the bench.

What do you all think about that?? This would eliminate the ol' boucning spar in the jig.
Will
7A 72452 Wings
\_____@(")@_____/

User avatar
captain_john
Sparky
Posts: 5880
Joined: Sun Oct 31, 2004 9:17 am
Location: KPYM

Post by captain_john »

Nuttin' wrong with nailing the mains onto the spars on a table.

The jig is best for making sure the skins will line up correctly and to ensure there is no twist (warpage) during the skin drilling & riveting process.

It would be possible to build a twist into the product if it were done on a table.

:| CJ
RV-7
Garmin G3X with VP-X & a TMX-IO-360 with G3i
It's all over but the flying! 800+ hours in only 3 years!

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

captain_john wrote:Nuttin' wrong with nailing the mains onto the spars on a table.
Huh?
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

User avatar
captain_john
Sparky
Posts: 5880
Joined: Sun Oct 31, 2004 9:17 am
Location: KPYM

Post by captain_john »

Spike wrote:
captain_john wrote:Nuttin' wrong with nailing the mains onto the spars on a table.
Huh?
What?

:? CJ
RV-7
Garmin G3X with VP-X & a TMX-IO-360 with G3i
It's all over but the flying! 800+ hours in only 3 years!

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

What does that mean? "Nailing the mains to the spars" ?
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

prestwich
Class D
Posts: 317
Joined: Fri May 20, 2005 8:36 am
Location: Santa Barbara

Post by prestwich »

Since my shop is only 4' 11" wide, I think I'll build one wing at a time. :lol:

tshort
Class C
Posts: 618
Joined: Tue Nov 30, 2004 12:56 am
Location: Indianapolis, IN (KUMP)

Post by tshort »

Spike wrote:What does that mean? "Nailing the mains to the spars" ?
Riveting the main ribs to the spar...
I did that on the bench.

T.

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

Thanx tshort. Ya would have thought he could have just said that. Guess its the north east influence on him. One day he will learn English.
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

User avatar
dons
Class C
Posts: 873
Joined: Thu Apr 20, 2006 4:28 pm
Location: Waterloo, Ontario, Canada

Post by dons »

This is one reason I decided to start posting in this place, there is more to ribbing than just putting them between skins. :)
Don Sinclair
CYKF
RV-7A (Fuselage)

Spike
Chief Rivet Banger
Posts: 4013
Joined: Thu Oct 14, 2004 8:40 pm
Location: Baltimore, MD
Contact:

Post by Spike »

This definately a place to have fun. :mrgreen:
http://www.rivetbangers.com - Now integrating web and mail!
Current Build: 2 years into a beautiful little girl

Post Reply